Friday, May 16, 2025
  • Contact Us
  • About BBS
  • Privacy & Policy
ENG
DZO
BBSCL Logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • More
    • Announcement
    • Programme
    • Radio Dzo-Channel Schedule
    • Radio Mix-Channel Schedule
Radio Live
No Result
View All Result
BBSCL logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • More
    • Announcement
    • Programme
    • Radio Dzo-Channel Schedule
    • Radio Mix-Channel Schedule
No Result
View All Result
BBSCL logo
Radio LIVE

Phuentshogling Township Project’s Zone A to finish next year, slightly behind schedule

August 22, 2024
in Development, Other Stories, Social
Reading Time: 2 mins read
0
0
SHARES
5
VIEWS
Share on FacebookShare on Twitter

The Phuentshogling Township Development Project is expected to complete its Zone A next year as planned. The project is three to four percent behind schedule currently and its completion also depends on the relocation of Amochhu temporary shelter, which currently occupies 17 acres of the project site.

The project is in its second stage of developing urban infrastructure in Zone A which spans 160 acres.

The works in the current phase include the installation of the water treatment plant and distribution network, sewage treatment plant, construction of pedestrian bridges, and supply power and telecommunication network among others.

Today, 43 per cent of the works are complete in Zone A. The project is facing challenges due to the rainy weather and is behind schedule by a few per cent.

According to the project officials, the risk of flooding from Amochhu is a major challenge. They said the flood in June last year cost the project Nu 3.5 M to clear the debris in six drains inside the project area.

Officials added that such disasters with huge costs are set to continue every year if the government does not intervene and stabilise the hillside and protect downstream developments.

In addition, the project’s completion remains uncertain if the Amochhu temporary shelter constructed during the COVID-19 pandemic remains within the project area.

According to the project officials, this would mean concessionary loans received from the Asian Development Bank for the project will remain unutilised and the development of the area in the future and the source of funding remains uncertain.  

“The temporary shelter still occupies around 11 per cent of the project area. Unfortunately, we could not develop that area, infrastructure such as roads and water supply could not be developed in that particular area. This means the overall project completion will not be completed if the shelter is not removed,” said Kamal Dhakal, project director at the Construction Development Corporation Limited.

He added that the main motive of the project is to mitigate flood risk and also create space for town expansion.

“Phuentshogling Township Development Project was planned to protect Phuentshogling town from flood from Amochhu. Before the project, areas along the river and the city were under threat. While doing the river training works, we reclaimed around 160 acres of land on which infrastructural works are ongoing.”

The first phase which focused on river training, and embankment has been completed. The planned township has four zones, A, B, C and D.

Works on Zone A are scheduled to be completed in May next year.

Kinley Dem, Chhukha

Edited by Phub Gyem

Previous Post

Tsamang Gewog residents call for motorable bridge over Kurichu to ease travel

Next Post

Mini hydropower plants generate over Nu 50 M in revenue

Next Post

Mini hydropower plants generate over Nu 50 M in revenue

Zhemgang local leaders discuss ways to ease BDBL's rural loan application procedure

Monggar-Lhuentse highway in need of maintenance

Please login to join discussion

RECOMMENDED NEWS

Education ministry to increase students’ stipend by next fiscal year

6 years ago
9
Government raises additional Nu 1.25bn from bonds

Government raises additional Nu 1.25bn from bonds

2 years ago
2
“…the stocks in the shops will never run out, there will be a continuous supply.”- COVID-19 scare

“…the stocks in the shops will never run out, there will be a continuous supply.”- COVID-19 scare

5 years ago
1
Closing ceremony for second phase of million fruit tree plantation project held in Sarpang

Closing ceremony for second phase of million fruit tree plantation project held in Sarpang

2 years ago
3

BROWSE BY CATEGORIES

  • Accidents (14)
  • Agriculture (416)
  • Announcement (171)
  • Business (733)
  • Crime/Legal (362)
  • Culture (43)
  • Development (49)
  • Disaster (56)
  • Economy (268)
  • Education (402)
  • Entertainment (11)
  • Environment (52)
  • Feature (65)
  • Featured (6)
  • Festival (77)
  • GMC (12)
  • Headlines (5)
  • Health (612)
  • Legal (51)
  • Literature (9)
  • Livestock (73)
  • Media (23)
  • Other Stories (5,451)
  • Politics (418)
  • RCSC (1)
  • Recent stories (5)
  • Religion (43)
  • Sci/Tech (708)
  • Social (479)
  • Sports (442)
  • Technology (190)
  • Tourism (17)
  • Uncategorized (13,865)
  • Video (128)
  • Video Story (241)
  • Wildlife (39)

BROWSE BY TOPICS

Tender Announcement Vacancy Announcement

POPULAR NEWS

  • BPC’s investigation rules out transformer short circuit as Damchhu forest fire cause

    Viral video of Bhutanese man assaulted by locals and police in Jaigaon sparks safety concerns

    0 shares
    Share 0 Tweet 0
  • Gelephu Mindfulness City opens recruitment drive for Bhutanese professionals

    0 shares
    Share 0 Tweet 0
  • A centenarian’s recipe to longevity

    0 shares
    Share 0 Tweet 0
  • Post-mortem confirms foul play: Progress in investigation of 24-year-old woman’s death

    0 shares
    Share 0 Tweet 0
  • Newspaper accuses DPT candidate of political ploy

    0 shares
    Share 0 Tweet 0
BBSCL

Bhutan Broadcasting Service (BBS) is Bhutan’s primary national broadcaster, delivering diverse news and entertainment in multiple languages, fostering cultural understanding and public knowledge.

Follow us on social media:

Recent News

  • Infrastructure woes and relocation uncertainty hinder Olakha Automobile Workshop development
  • Health ministry reaffirms commitment to expand KMC practice nationwide
  • Construction of first Multi-Disciplinary Super-Speciality Hospital expected to begin next year
  • Wangdue Phodrang’s Daga Gewog nears goal of road access for every household
  • Bhutan debuts at Venice Architecture Biennale 2025 with Gelephu International Airport design

News Category

  • Accidents
  • Agriculture
  • Announcement
  • Business
  • Crime/Legal
  • Culture
  • Development
  • Disaster
  • Economy
  • Education
  • Entertainment
  • Environment
  • Feature
  • Featured
  • Festival
  • GMC
  • Headlines
  • Health
  • Legal
  • Literature
  • Livestock
  • Media
  • Other Stories
  • Politics
  • RCSC
  • Recent stories
  • Religion
  • Sci/Tech
  • Social
  • Sports
  • Technology
  • Tourism
  • Uncategorized
  • Video
  • Video Story
  • Wildlife
  • Contact Us
  • About BBS
  • Privacy & Policy

© 2024 BBSCL. All rights reserved.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • More
    • Announcement
    • Programme
    • Radio Dzo-Channel Schedule
    • Radio Mix-Channel Schedule

© 2024 BBSCL. All rights reserved.