Thursday, June 18, 2026
  • GMC
  • Contact Us
  • About BBS
  • Privacy & Policy
ENG
DZO
BBSCL Logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet
Radio Live
No Result
View All Result
BBSCL logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet
No Result
View All Result
BBSCL logo

Khorlochhu Hydropower Project takes off with Nu 16.8bn contracts

January 13, 2025
in Economy, Other Stories
Reading Time: 2 mins read
0
0
SHARES
1.1k
VIEWS
Share on FacebookShare on Twitter

The 600-megawatt Khorlochhu Hydro Power Project took a major step forward with the signing of four contracts worth Nu 16.8bn on 10th January. The contracts will cover the construction of a dam and powerhouse. The two main shareholders, Druk Green Power Corporation and Tata Power Company Limited, also held their first general and board meetings in Trashi Yangtse, appointing the project’s Chief Executive Officer and other key personnel.

During the meeting, the project management also signed three major civil work contracts with Jaiprakash Associate Limited and Construction Development Corporation Limited, CDCL.

Jaiprakash Associate Limited was awarded the dam construction worth Nu 9.7bn while the powerhouse contract worth Nu 4.9bn was shared between Jaiprakash Associate Limited and CDCL. As per the understanding, 20 per cent of the powerhouse works amounting to Nu 1.2bn was awarded to CDCL.

In addition, the project also signed a contract with the State Mining Corporation of Bhutan to supply sand and aggregates worth Nu 873 M.

Meanwhile, Jaiprakash Associate Limited and CDCL have already mobilized preparatory work for the construction of major components, including the dam, powerhouse, and headrace tunnel.

The contract for the headrace tunnel work worth Nu 4.3bn was awarded in 2021.

The shareholders and board members instructed the contractors and project management to finalise the construction schedule and prioritise early completion of the project.

They also directed the management to expedite the appointment of the design and project management consultant and the awarding of contracts for electro-mechanical and hydro-mechanical works.

The project, with an estimated cost of Nu 69bn is scheduled for completion and commissioning by 2029.

Once completed, the project is expected to generate 2,524 million units of electricity annually. While Bhutan will utilise most of the energy during the winter months, the surplus generated in the summer will be exported through Tata Power Trading Company Limited.

The Khorlochu project development is aligned with Bhutan’s strategic vision in achieving an additional generation capacity of 15,000 Megawatts hydropower and 5,000 megawatts solar by 2040.

Meanwhile, DGPC and Tata Power Company have initiated preliminary consultations for the implementation of the 1,125-megawatt Dorjilung Project

Sonam Darjay, Trashi Yangtse

Edited by Sonam Pem

Previous Post

DRC’s new tax intermediary pilot programme receives positive feedback

Next Post

New irrigation scheme promises better yields and livelihoods in Dagana

Next Post
New irrigation scheme promises better yields and livelihoods in Dagana

New irrigation scheme promises better yields and livelihoods in Dagana

Human negligence fuels rising forest fires in Bhutan, threatening biodiversity and livelihoods

Human negligence fuels rising forest fires in Bhutan, threatening biodiversity and livelihoods

Advocacy network summit calls for reforms in Bhutan’s drug response system

Advocacy network summit calls for reforms in Bhutan's drug response system

RECOMMENDED NEWS

Residents unhappy with road improvement works at Kekila to Garpang Secondary National Highway

4 years ago
15

Football brings people together again- Samtse

4 years ago
15
Invasive polka dot plants spreading rapidly across Samtse

Invasive polka dot plants spreading rapidly across Samtse

2 years ago
66

Woman detained for forgery

10 years ago
16

BROWSE BY CATEGORIES

  • Accidents (16)
  • Agriculture (617)
  • Announcement (232)
  • Audience Survey Report (2)
  • Business (870)
  • Crime/Legal (441)
  • Culture (102)
  • Development (94)
  • Disaster (84)
  • Economy (404)
  • Education (511)
  • Entertainment (33)
  • Environment (154)
  • Feature (86)
  • Featured (14)
  • Festival (119)
  • Global Peace Prayer Festival (4)
  • GMC (84)
  • Gyalsung (1)
  • Headlines (4)
  • Health (756)
  • HYDROPOWER (26)
  • K4 70th Birthday special feature (2)
  • Legal (84)
  • Literature (10)
  • Livestock (104)
  • Media (42)
  • Other Stories (7,039)
  • Pelsung (1)
  • Politics (432)
  • RCSC (11)
  • Recent stories (5)
  • Religion (68)
  • Sci/Tech (756)
  • Social (905)
  • Sports (564)
  • Technology (230)
  • Textile (2)
  • Tourism (54)
  • Uncategorized (13,891)
  • Video (142)
  • Video Story (258)
  • Wildlife (54)

BROWSE BY TOPICS

Tender Announcement Vacancy Announcement

POPULAR NEWS

  • ‘News in Tales’ workshop equips Bhutanese journalists with narrative storytelling skills

    ‘News in Tales’ workshop equips Bhutanese journalists with narrative storytelling skills

    0 shares
    Share 0 Tweet 0
  • Viral video of Bhutanese man assaulted by locals and police in Jaigaon sparks safety concerns

    0 shares
    Share 0 Tweet 0
  • Dzongkha Books, the last to be bought.

    0 shares
    Share 0 Tweet 0
  • Authorities link 23 TikTok accounts to online shopping-based gambling, freeze 26 other bank accounts

    0 shares
    Share 0 Tweet 0
  • Gelephu Mindfulness City opens recruitment drive for Bhutanese professionals

    0 shares
    Share 0 Tweet 0
BBSCL

Bhutan Broadcasting Service (BBS) is Bhutan’s primary national broadcaster, delivering diverse news and entertainment in multiple languages, fostering cultural understanding and public knowledge.

Follow us on social media:

Recent News

  • Sacred relic preparations underway for Project 108
  • Digital Readiness Programme reveals gaps in hotels’ online presence
  • Pay revision expected soon, subject to economic assessment
  • Eight priority programmes to drive economic transformation in 2026-27, says PM
  • His Majesty The King graces closing of fifth session of the fourth Parliament

News Category

  • Accidents
  • Agriculture
  • Announcement
  • Audience Survey Report
  • Business
  • Crime/Legal
  • Culture
  • Development
  • Disaster
  • Economy
  • Education
  • Entertainment
  • Environment
  • Feature
  • Featured
  • Festival
  • Global Peace Prayer Festival
  • GMC
  • Gyalsung
  • Headlines
  • Health
  • HYDROPOWER
  • K4 70th Birthday special feature
  • Legal
  • Literature
  • Livestock
  • Media
  • Other Stories
  • Pelsung
  • Politics
  • RCSC
  • Recent stories
  • Religion
  • Sci/Tech
  • Social
  • Sports
  • Technology
  • Textile
  • Tourism
  • Uncategorized
  • Video
  • Video Story
  • Wildlife
  • GMC
  • Contact Us
  • About BBS
  • Privacy & Policy

© 2024 BBSCL. All rights reserved.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In
🔊 BBS.BT Listen to Article
Listen to Article

Add New Playlist

No Result
View All Result
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet

© 2024 BBSCL. All rights reserved.

♿ ACCESSIBILITY