Friday, August 15, 2025
  • Webmail
  • Contact Us
  • About BBS
  • Privacy & Policy
ENG
DZO
BBSCL Logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • Radio Dzo-Channel Schedule
    • Radio Mix-Channel Schedule
Radio Live
No Result
View All Result
BBSCL logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • Radio Dzo-Channel Schedule
    • Radio Mix-Channel Schedule
No Result
View All Result
BBSCL logo

People unhappy with the bridge construction progress

May 31, 2012
in Uncategorized
Reading Time: 2 mins read
0
0
SHARES
3
VIEWS
Share on FacebookShare on Twitter
[media id=162 width=320 height=260]

People of lower Kheng are not happy with the progress of the bridge construction that will connect Pangbang with Gomphu. The mega construction work has been delayed by some nine months now.

The people say they need the bridge urgently. The road construction that connects Pangbang with Tingtibi has been stalled after a rough cutting was completed because of the bridge. Heavy machinery are required to continue the road construction but there is no bridge.

Once the road is complete people of Panbang need not have to travel from the Indian states of Assam. They say it is not so safe and reliable to use the current route because of security reasons and frequent strikes.

Moreover, the road was constructed only for the Manas National Park. At the moment, everyone travelling to Panbang have to ride through the Indian side of the Manas National Park of India, disturbing the protected ecosystems.

“We have to depend on Indian escort security when we travel to other places. If the bridge is completed at the earliest then rest of constructions on the other side will move faster,” said Nangla Gup.

Why is it that the bridge construction is taking long? The project manager of the bridge construction, Rafiqul Hussain, said change in design of the bridge, poor road condition from the border gate till Panbang, frequent strikes in India and shortage of labour as some reasons of the delay.

“We needed specific cement and that added to more delay, by some two months,” he added.

However, the consultant does not agree. Pashupati Kharga said apart from changes in the design of the project rest are but mere excuses. “The contractor should have anticipated the problems like labour shortage, strikes and construction materials and made plans accordingly,” he said.

The construction management claims that about 80 percent of the project complete and it will take not more four months to fully hand over the bridge. However, some people said it might take longer than that looking at the pace of the construction.

For now, people of Panbang will have to follow the same routine that they have been doing in the past.

Previous Post

4 students of YHSS convicted

Next Post

Gasa- remote no more

Next Post

Gasa- remote no more

A house gutted in Lhuentse

Senior civil servants appointed and transferred

Please login to join discussion

RECOMMENDED NEWS

10-bedded hospital for Autsho by June this year

10-bedded hospital for Autsho by June this year

3 years ago
5
Kidney beans become lucrative crop for farmers in Lumang Gewog despite wildlife challenges

Kidney beans become lucrative crop for farmers in Lumang Gewog despite wildlife challenges

9 months ago
551

People of Chamkhar unhappy with the quality of blacktopping works

5 years ago
2
Chamkharchhu Hydrpower Project finalised

Chamkharchhu Hydrpower Project finalised

10 years ago
7

BROWSE BY CATEGORIES

  • Accidents (15)
  • Agriculture (477)
  • Announcement (188)
  • Audience Survey Report (1)
  • Business (774)
  • Crime/Legal (382)
  • Culture (52)
  • Development (59)
  • Disaster (57)
  • Economy (302)
  • Education (437)
  • Entertainment (18)
  • Environment (77)
  • Feature (66)
  • Featured (9)
  • Festival (83)
  • GMC (20)
  • Headlines (5)
  • Health (650)
  • HYDROPOWER (1)
  • Legal (57)
  • Literature (10)
  • Livestock (80)
  • Media (26)
  • Other Stories (5,901)
  • Politics (421)
  • RCSC (1)
  • Recent stories (5)
  • Religion (46)
  • Sci/Tech (725)
  • Social (603)
  • Sports (478)
  • Technology (200)
  • Tourism (23)
  • Uncategorized (13,873)
  • Video (142)
  • Video Story (258)
  • Wildlife (43)

BROWSE BY TOPICS

Tender Announcement Vacancy Announcement

POPULAR NEWS

  • BPC’s investigation rules out transformer short circuit as Damchhu forest fire cause

    Viral video of Bhutanese man assaulted by locals and police in Jaigaon sparks safety concerns

    0 shares
    Share 0 Tweet 0
  • Gelephu Mindfulness City opens recruitment drive for Bhutanese professionals

    0 shares
    Share 0 Tweet 0
  • Authorities link 23 TikTok accounts to online shopping-based gambling, freeze 26 other bank accounts

    0 shares
    Share 0 Tweet 0
  • A centenarian’s recipe to longevity

    0 shares
    Share 0 Tweet 0
  • 40 companies risk closure over failure to submit financial reports

    0 shares
    Share 0 Tweet 0
BBSCL

Bhutan Broadcasting Service (BBS) is Bhutan’s primary national broadcaster, delivering diverse news and entertainment in multiple languages, fostering cultural understanding and public knowledge.

Follow us on social media:

Recent News

  • Bhutan enters digital era of land management with NSDI launch
  • Royal Institute of Performing Arts opens in Thimphu
  • Gelephu hotels see surge in business as GMC project draws international visitors
  • Bhutanese films “I, the Song” and “Zampa” head to Osaka Asian Film Festival
  • Daga Rabdhey proposes to postpone Dagana Tshechu

News Category

  • Accidents
  • Agriculture
  • Announcement
  • Audience Survey Report
  • Business
  • Crime/Legal
  • Culture
  • Development
  • Disaster
  • Economy
  • Education
  • Entertainment
  • Environment
  • Feature
  • Featured
  • Festival
  • GMC
  • Headlines
  • Health
  • HYDROPOWER
  • Legal
  • Literature
  • Livestock
  • Media
  • Other Stories
  • Politics
  • RCSC
  • Recent stories
  • Religion
  • Sci/Tech
  • Social
  • Sports
  • Technology
  • Tourism
  • Uncategorized
  • Video
  • Video Story
  • Wildlife
  • Webmail
  • Contact Us
  • About BBS
  • Privacy & Policy

© 2024 BBSCL. All rights reserved.

Welcome Back!

Login to your account below

Forgotten Password? Sign Up

Create New Account!

Fill the forms below to register

All fields are required. Log In

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • Radio Dzo-Channel Schedule
    • Radio Mix-Channel Schedule

© 2024 BBSCL. All rights reserved.