Tuesday, November 3, 2026
  • GMC
  • Contact Us
  • About BBS
  • Privacy & Policy
ENG
DZO
BBSCL Logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet
Radio Live
No Result
View All Result
BBSCL logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet
No Result
View All Result
BBSCL logo

PHPA-II generates 27 M units of electricity since commissioning last month

Share on FacebookShare on Twitter

The Punatsangchhu-II Hydroelectric Project generated nearly 27 M units of electricity since the commissioning of two of its six units on the 17th of last month until Sunday. This is equivalent to 27 megawatts which is being consumed within the country to meet domestic demand. The PHPA-II authority has sold the electricity to Bhutan Power Corporation. Once fully operational, PHPA-II is expected to start exporting power to India and generate an annual revenue of Nu 20bn.

The Department of Energy says it cannot disclose revenue generated from sales to BPC until the Royal Government and the Government of India finalise the tariff.

However, the rate is expected to be higher than that of Mangdechhu. Following the latest revision, the Mangdechhu hydropower project is currently exporting electricity to India at Nu 4.53 per unit.

“The Bhutanese and Indian governments are currently negotiating the tariff. Once finalized, a Power Purchasing Agreement (PPA) will need to be signed to enable power exports. Until then, the revenue generated from sales to BPC cannot be disclosed,” said Karma P Dorji, the Director General of the Department of Energy.

He added that the commissioning of PHPA-II has reduced Bhutan’s electricity import during the lean season.

While Bhutan imports 300 to 700 MW of power daily, PHPA-II currently generates only 170 MW daily as only one unit is operational due to the limited flow of water during winter.

With domestic demand reaching 1,026 MW and the power generation capacity of the existing plants dropping close to 435 MW during the lean season, Bhutan relies on imports to meet the shortfall.

Meanwhile, the Department of Energy says the issue of water seepage in the powerhouse of PHPA-II is being resolved.

The Director General said, “Water seepage is inevitable in all powerhouses, including Punatsangchhu-II, due to the large-scale water tunnels and significant water flow involved. While it is not a major concern at present, any significant seepage issues in the future may require shutting down the powerhouse, draining the water, and carrying out necessary maintenance.”

He added that PHPA-II plays a key role in Bhutan’s vision to become a regional energy hub by increasing power export capacity, enhancing energy security, promoting sustainable energy, and strengthening regional partnerships.

Works to commission the remaining four units have commenced and are expected to be ready on or before the monsoon.

The 1,020 MegaWatt Punatsangchhu-II Project is being implemented jointly by the Royal Government and the Government of India.

Tashi Dekar

Edited by Phub Gyem

RECOMMENDED NEWS

MHEP Unit III resumes power generation

MHEP Unit III resumes power generation

5 years ago
47
For the love of game, age not barrier

For the love of game, age not barrier

10 years ago
25

NC questions MoWHS Minister on Damchu-Chhukha bypass

12 years ago
23

Supporting Climate Resilience and Transformational Changes in the Agriculture Sector in Bhutan

7 years ago
19

BROWSE BY CATEGORIES

  • 108 chorten (19)
  • Accidents (18)
  • Agriculture (668)
  • Announcement (238)
  • Anti Corruption Commission of Bhutan (2)
  • Audience Survey Report (2)
  • Business (930)
  • Climate Change (12)
  • Crime/Legal (464)
  • Culture (123)
  • Development (118)
  • Disaster (112)
  • Economy (435)
  • Education (547)
  • ENERGY (1)
  • Entertainment (38)
  • Environment (188)
  • Feature (93)
  • Featured (17)
  • Festival (129)
  • Global Peace Prayer Festival (4)
  • GMC (151)
  • Gyalsung (4)
  • Headlines (17)
  • Health (808)
  • HYDROPOWER (28)
  • K4 70th Birthday special feature (2)
  • Legal (89)
  • Literature (11)
  • Livestock (109)
  • Media (46)
  • Other Stories (7,470)
  • Pelsung (4)
  • Politics (449)
  • RCSC (16)
  • Recent stories (5)
  • Religion (89)
  • Sci/Tech (772)
  • Social (1,042)
  • Sports (618)
  • Technology (243)
  • Textile (3)
  • Tourism (80)
  • Uncategorized (13,897)
  • Video (142)
  • Video Story (258)
  • Wildlife (61)

BROWSE BY TOPICS

Tender Announcement Vacancy Announcement

POPULAR NEWS

  • ‘News in Tales’ workshop equips Bhutanese journalists with narrative storytelling skills

    ‘News in Tales’ workshop equips Bhutanese journalists with narrative storytelling skills

    0 shares
    Share 0 Tweet 0
  • Viral video of Bhutanese man assaulted by locals and police in Jaigaon sparks safety concerns

    0 shares
    Share 0 Tweet 0
  • Dzongkha Books, the last to be bought.

    0 shares
    Share 0 Tweet 0
  • Authorities link 23 TikTok accounts to online shopping-based gambling, freeze 26 other bank accounts

    0 shares
    Share 0 Tweet 0
  • Gelephu Mindfulness City opens recruitment drive for Bhutanese professionals

    0 shares
    Share 0 Tweet 0
BBSCL

Bhutan Broadcasting Service (BBS) is Bhutan’s primary national broadcaster, delivering diverse news and entertainment in multiple languages, fostering cultural understanding and public knowledge.

Follow us on social media:

Recent News

  • Thousands of devotees circumambulate 108 Jangchub Chorten in Gelephu
  • Gelephu Mindfulness City aims to build trust-based financial system to attract investors
  • 108 Jangchub Chorten, vision made reality
  • Re-Tender for the supply of Tyres and Tubes
  • Tender for the Construction of RCC gate, Security Guard House, RMM Wall, Development of porch area, Blacktopping of parking area, Installation of Automatic Boom Barrier Sliding folding gate system, and modification of the main entrance gate.

News Category

  • 108 chorten
  • Accidents
  • Agriculture
  • Announcement
  • Anti Corruption Commission of Bhutan
  • Audience Survey Report
  • Business
  • Climate Change
  • Crime/Legal
  • Culture
  • Development
  • Disaster
  • Economy
  • Education
  • ENERGY
  • Entertainment
  • Environment
  • Feature
  • Featured
  • Festival
  • Global Peace Prayer Festival
  • GMC
  • Gyalsung
  • Headlines
  • Health
  • HYDROPOWER
  • K4 70th Birthday special feature
  • Legal
  • Literature
  • Livestock
  • Media
  • Other Stories
  • Pelsung
  • Politics
  • RCSC
  • Recent stories
  • Religion
  • Sci/Tech
  • Social
  • Sports
  • Technology
  • Textile
  • Tourism
  • Uncategorized
  • Video
  • Video Story
  • Wildlife
  • GMC
  • Contact Us
  • About BBS
  • Privacy & Policy

© 2024 BBSCL. All rights reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
🔊 BBS.BT Listen to Article
Listen to Article

Add New Playlist

RADIO LIVE
No Result
View All Result
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet

© 2024 BBSCL. All rights reserved.

♿ ACCESSIBILITY