Friday, November 6, 2026
  • GMC
  • Contact Us
  • About BBS
  • Privacy & Policy
ENG
DZO
BBSCL Logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet
Radio Live
No Result
View All Result
BBSCL logo
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet
No Result
View All Result
BBSCL logo

PHPA-II commissioned, expected to generate Nu 20bn annually once fully operational

Share on FacebookShare on Twitter

After almost 14 years of work on the 1,020-megawatt Punatsangchhu-II Hydroelectric Project, there is finally light at the end of the tunnel. Today, the testing and commissioning of this highly anticipated mega hydropower project began with the first spinning of units one and two turbines. Energy and Natural Resources Minister Gem Tshering attended the commissioning event with project officials.

Testing and commissioning of the project occurred in phases. In February, the project began filling the dam reservoir. By late June, the headrace tunnel—a tunnel that directs water from the reservoir to the powerhouse—was filled.

Earlier this month, the tailrace tunnel—a tunnel that carries water away from the turbine after power generation—was also filled.

On Monday, the pressure shaft, which manages water pressure in the headrace tunnel, was filled just before the spinning of the two turbines.

According to project officials, the successful spinning of the two turbines shows that the hydro-mechanical components are ready for commissioning.

Meanwhile, the energy and natural resources minister said that the rate of tariff is still being discussed with the Government of India.

Energy and Natural Resources Minister Gem Tshering “We are still under tariff negotiation. The tariff might go above Nu 5 per unit. But then, our proposal is Nu 5.8. Whereas, the Government of India wants it to be around Nu 5. So most probably, we might land up around Nu 5.2 or so.”

The diversion dam of Punatsangchhu-II is situated about 20 kilometres downstream of the Wangdue Phodrang Bridge.

The project’s underground powerhouse is located 15 kilometres downstream from the dam at Kamichhu in Daga Gewog.

The energy and natural resources minister said that once all six turbines are operational, PHPA-II is expected to generate Nu 20bn in annual revenue.

The project officials shared that they plan to have all six units of the Punatsangchhu-II Hydroelectric Project commissioned by December 2024. The total estimated cost of the project stands at around Nu 94bn.

Karma Samten Wangda, Wangdue Phodrang

Edited by Sherub Dorji 

Please login to join discussion

RECOMMENDED NEWS

Banning street hawkers serious social injustice: DNT

Banning street hawkers serious social injustice: DNT

11 years ago
21

Thimphu hospital receiving increasing number of stabbing cases

12 years ago
31
Government will continue to support students to study in private schools

Government will continue to support students to study in private schools

5 years ago
34
Thimphu residents call for installation of more CCTV cameras amid rising crime

Thimphu residents call for installation of more CCTV cameras amid rising crime

2 years ago
116

BROWSE BY CATEGORIES

  • 108 chorten (21)
  • Accidents (18)
  • Agriculture (669)
  • Announcement (238)
  • Anti Corruption Commission of Bhutan (2)
  • Audience Survey Report (2)
  • Business (930)
  • Climate Change (12)
  • Crime/Legal (464)
  • Culture (124)
  • Development (118)
  • Disaster (112)
  • Economy (435)
  • Education (547)
  • ENERGY (1)
  • Entertainment (38)
  • Environment (189)
  • Feature (94)
  • Featured (17)
  • Festival (129)
  • Global Peace Prayer Festival (4)
  • GMC (152)
  • Gyalsung (4)
  • Headlines (8)
  • Health (809)
  • HYDROPOWER (28)
  • K4 70th Birthday special feature (2)
  • Legal (89)
  • Literature (11)
  • Livestock (109)
  • Media (46)
  • Other Stories (7,472)
  • Pelsung (4)
  • Politics (449)
  • RCSC (16)
  • Recent stories (9)
  • Religion (89)
  • Sci/Tech (772)
  • Social (1,044)
  • Sports (619)
  • Technology (243)
  • Textile (3)
  • Tourism (80)
  • Uncategorized (13,898)
  • Video (142)
  • Video Story (258)
  • Wildlife (61)

BROWSE BY TOPICS

Tender Announcement Vacancy Announcement

POPULAR NEWS

  • ‘News in Tales’ workshop equips Bhutanese journalists with narrative storytelling skills

    ‘News in Tales’ workshop equips Bhutanese journalists with narrative storytelling skills

    0 shares
    Share 0 Tweet 0
  • Viral video of Bhutanese man assaulted by locals and police in Jaigaon sparks safety concerns

    0 shares
    Share 0 Tweet 0
  • Dzongkha Books, the last to be bought.

    0 shares
    Share 0 Tweet 0
  • Authorities link 23 TikTok accounts to online shopping-based gambling, freeze 26 other bank accounts

    0 shares
    Share 0 Tweet 0
  • Gelephu Mindfulness City opens recruitment drive for Bhutanese professionals

    0 shares
    Share 0 Tweet 0
BBSCL

Bhutan Broadcasting Service (BBS) is Bhutan’s primary national broadcaster, delivering diverse news and entertainment in multiple languages, fostering cultural understanding and public knowledge.

Follow us on social media:

Recent News

  • Volunteers help keep Gelephu clean during historic 108 Stupas event
  • Pineapple farming transforms livelihoods in Durungri, Pema Gatshel
  • Bhutan projected to become an ageing society by 2028: World Bank
  • Bhutan prepares for SAFF Championship opener against Bangladesh
  • Bhutan sets Guinness World Record with 108 stupas built and consecrated in nine hours

News Category

  • 108 chorten
  • Accidents
  • Agriculture
  • Announcement
  • Anti Corruption Commission of Bhutan
  • Audience Survey Report
  • Business
  • Climate Change
  • Crime/Legal
  • Culture
  • Development
  • Disaster
  • Economy
  • Education
  • ENERGY
  • Entertainment
  • Environment
  • Feature
  • Featured
  • Festival
  • Global Peace Prayer Festival
  • GMC
  • Gyalsung
  • Headlines
  • Health
  • HYDROPOWER
  • K4 70th Birthday special feature
  • Legal
  • Literature
  • Livestock
  • Media
  • Other Stories
  • Pelsung
  • Politics
  • RCSC
  • Recent stories
  • Religion
  • Sci/Tech
  • Social
  • Sports
  • Technology
  • Textile
  • Tourism
  • Uncategorized
  • Video
  • Video Story
  • Wildlife
  • GMC
  • Contact Us
  • About BBS
  • Privacy & Policy

© 2024 BBSCL. All rights reserved.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
🔊 BBS.BT Listen to Article
Listen to Article

Add New Playlist

RADIO LIVE
No Result
View All Result
  • Home
  • Business
  • Politics
  • Sports
  • Education
  • Announcement
  • More
    • Audience Survey Report
    • Programme
    • BBS Radio Channel Schedule
    • Intranet

© 2024 BBSCL. All rights reserved.

♿ ACCESSIBILITY