The 180-feet Hatigar Bridge in Logchina Gewog under Chhukha was inaugurated, today.
The bridge is part of the 27-kilometer gewog connectivity road from Phentshogling to the Logchina Gewog Center. It will benefit about 250 households.
It was constructed at a cost of Nu 11.8 M. The construction began in 2012 and was completed in 2014.
It was funded by the Small Development Projects with support from the Government of India.