The 126 MW Dagachhu Hydropower Project will be again delayed. While testing the generating units at the Dagachhu Hydropower project, the connection chann el failed the test after it developed cracks.
|
---|
The test was conducted on Friday evening. About 10 metre of the connection channel suffered cracks.
BBS’ Jigme Thinley spoke to Druk Green Power Corporation’s Managing Director, Dasho Chhewang Rinzin, yesterday.