Monthly Archives: December, 0

Paving way for developing ICT

To strengthen the collaboration in infocomm technology, Singapore and Bhutan signed a government to government Memorandum of Understanding, today.

A man crippled by obesity

It has been a decade since he last moved. For Phub Dorji, 27, the outside world is the limited view from his small window where he spends most of his time.

Nu.60 million collected for Wangdue Dzong reconstruction

The fund raising show for the Wangdue Phodrang Dzong reconstruction by the Bhutan Broadcasting Service ended today. The show collected over Nu.60 million in cash. It excludes the amount  sent through text messages and last minute contribution.

First test flight at Gelephu airport successful

The 48 seat ATR-42 Drukair successfully landed at the Gelephu airport on its first test flight today. The flight took off from Paro International Airport and landed at Gelephu airport after about 20 minutes.

Thorthomi Lake successfully lowered by five metres

The water level of Thorthomi Lake has been successfully lowered by five metres this month. The mitigation works at Thorthomi Lake in Lunana started in 2008, after studies revealed Thorthomi Lake as one of the potential lake posing threats downstream.

In pursuit of education

The number of Continuing Education students in Sherubtse College has been increasing over the years.

Famous Japanese singer perfroms at clock tower

A Famous Japanese singer, Kato Tokiko, performed a music concert at the clock tower square in Thimphu, today.

Bhutan fails to secure a seat in UN Security Council

Bhutan’s bid for a non-permanent seat in the United Nations Security Council failed to garner support from the 193 member assembly during an election held at UN Headquarters in New York

RIM expands masters degree programmes

The Royal Institute of Management (RIM) will start two new masters degree programmes by 2013 and 2014. In a press conference today, the institute said, a three member delegation visited some of the reputed universities abroad, recently to expand the institutional network.

Resurfacing of Bathpalathang airport begins

The Department of Civil Aviation has started the resurfacing works of Bathpalathang airport. It is scheduled to be complete within two months.

- Advertisment -
Google search engine

Most Read

Facebook
Twitter
Instagram
YouTube